When heavy rains hit the Sinking Spring area of Berks County, in less than an hour the community experienced significant flooding, including Zayo’s existing infrastructure building servicing the fiber optics in the area.
Five Nine Design Group responded rapidly and had a team assessing damage immediately. Our team assisted with disaster cleanup, temporary services, and designed and engineered a new elevated foundation and had it before the permit authority for reconstruction approval in less than 8 weeks.
Engineered a raised cast in place foundation and cat walk to elevate existing building above the flood plan. Land Survey and site assessment, geotechnical investigation, and full rapid turn-key services including architectural design, structural and electrical engineering, and permitting. Fast track project design for disaster recovery of site
© 2024 Copyright Five Nine Design Group.